1 – Surveyor Team Confirming Concession Limits 2 – Localized Corners and Official Limits
3 –Putting Intermediates Marks in the Trails 4 – Location of Geodesics Reference Points
5 – Taking Samples for Geochemistry Assaying 6 – International Geologists Checking Mineralization
7 – Detecting Gold Veins Inside Trenching at Pos. 37 8 - Geologist Measuring Gold Materials
9 – International Visitor Browsing over Pos. 47 10 – Our best assay results on the table at Pos. 47
11 – International Visitors at site 12 – Taking Samples at Pos. 9
13 – Sampling Ore body at Pos. 60 14 – Typical Schist formation at position 82
15 - Visitors Working Pos. 59 16 – Sampling at Complex Pos. 37
17 – Visitors at our Control Gate 18 – Frontier’s Staff at Toronto 2007
19 – Frontier’s Staff Checking Equipments at Toronto 20 - Frontier’s Staff Visiting Toronto
21 – Up to Date Mining Equipment in Toronto 22 - Mineralization (Copper pyrite), Eagle Project Pos. 100 PDAC2007
23 – Mineralization – Eagle Project – Pos. 109 24 – Mineralization, Puma Project, Alterated Pyrite- Pos. 37
25 - With Errol Checking Alterated Quartz Vein at 26 – Carbomatic Quartz Vein Intruding Granite – Pos. 59 Pos. 37
27 - Alterated Copper Pyrite at Pos. 59 28 – Big Carbomatic Quartz Vein at Pos. 59
29– Trenching and Quartz Vein with Errol at Pos. 37 30 - Measuring Big Mineralized Quartz Vein at Pos. 9
31– Pilot Project: Electrostatic Concentrator 32 – Pilot Project: Assembling Concentrator Electrodes
33 – General Overview of Electrostatic Concentrator 34 – Electrostatic Dry Concentrator
35 – Dry Micronizer Mill 36 – Side View of Micronizer Mill
37 – Pilot Program: Hightec Mineral Concentrator 38 – Detail of Bags Filter
39 – A High Tension Transformer Feeding our 40– Gravimetric Concentrator Concentrator
41 –Hydraulic Jig for the Gravimetric Concentration 42 – Milimetric Adjustment Device, Applied to the Jig
43 –Hammer Mill and Trommel 44 – Hammer Mill, Side View
45 –Cyanide Recovery Unit 46 – Cyanide Extraction Unit
47 – Dry Hammer Mill Assembled 48 – Primary Chemical Reactor
49 –Chain Micronizer Mill 50— Side View of Processing Plant
51 – Pilot Plant to Frontier Mining do Brasil 52 –Centrifuge Filtering System
53 – Dynamic Recovery and Absorption Cells 54 – Wastes Recovery System – Housing Machine
55 – Portable Houses, processing our wastes 56 – Environment Solution – Processing 100% of Wastes
57 – Housing Machine, inside view 58 – Housing Machine Processing Mineral Tailings
59 – Inside View of the Wasting Processing Plant 60 – Top View
61 - Opposite View
62 – Taking Material to Assay at Pos. 8 63 – Sampling to Geochemistry at pos. 59
64 – Sampling for Assaying at Pos. 9 65 – Field Team at Pos. 59
66 - Trenching
67 – Trenching 68 - Taking Samples – Schist’s at Pos. 82
69 – Recovering Wastes Dam 70– Trenching for Geochemistry Pos. 59
71 –Building a Control Gate to the Mine 72 –Sending Samples to Tucson, AZ
73 – Field Frontier’s Team Ready to Work |